Negotiated Sale: Buy Now
followed by Global Online Auction

AUGUST 14, 2018

All tools have been professionally deinstalled and removed from the fab and are currently in a warehouse in Silicon Valley

 
Over $22 Million in Original Acquisition Cost - 2014 / 2015 Generation Equipment
Accepting offers on individual tools or for the line in aggregate
Beamreach Solar is developing crystalline silicon based PV panels that offer the performance, quality, reliability, and sustainability of the best silicon-based PV panels. Our approach is based on a range of highly differentiated, IP-protected technology solutions. This technology is designed to scale from Beamreach Solar’s pilot plant to a large scale copy-exact factory, using high volume manufacturing tools, to keep manufacturing costs low.

Current photos and further description per tool coming soon
Please make an appointment for Inspection and/or Preview


Calendar

Starts

August 14, 2018

Begin Closing

August 16, 2018

Preview

August 13, 2018

Other Details

Currency

US Dollar

Buyer's Premium

15%

Removal Date

August 20, 2018

Location

All tools have been professionally deinstalled and removed from the fab and are currently in a warehouse in Silicon Valley

Contact

Name : Customer Service

Phone Number : (650) 344-3282

Email :

Role : n/a

Project Manager Contact

Name : John Carroll
Email :
Phone Number : (650) 678-3299
Role : President

Onsite Contact

Name : John Carroll
Email :
Phone Number : (650) 678-3299
Role : n/a

Financing Contact

Name : n/a
Email :
Phone Number : n/a
Role : n/a
This sale is in conjuction with
Onyx Asset Advisors

Event Alerts

Send me summary details from recent inspections.


Beamreach Negotiated Sale Period Extended Due to Continuing Inquires and Negotiations.
Pre-Sold Lots will NOT be Reflected in the Sale Catalog until Monday, August 13th.
Get your Bid In Now.


Over $22 Million in Original Acquisition Cost - 2014 / 2015 Generation Equipment
Accepting offers on individual tools or for the line in aggregate


Please make an appointment for Inspection and/or Preview

Previews/Inspections available on the weeks of July 9th and July 16th, 2018 by appointment only

List is subject to confirmation


Removal and shipping

n/a

Payment Information Downloads



Please Send us your Feedback and Questions

- OR -

COMPANY
Top